Forensic Scheduler - Project Controls & Delay Analysis Job at X4 Engineering, Houston, TX

QWRNdzQvY0RlUkhyZFY2N0w4TE5maWpyUVE9PQ==
  • X4 Engineering
  • Houston, TX

Job Description

Forensic Scheduler – Project Controls & Delay Analysis

Location: Hybrid (Texas)

Contract Type: Permanent

Salary: $80,000-$150,000 + Bonus

X4 Engineering is seeking a highly detail-oriented and analytical forensic scheduler to join my client's dynamic team! This role involves developing and maintaining baseline schedules, performing real-time schedule updates, conducting delay analysis, and contributing to claims resolution. The ideal candidate has a strong background in CPM scheduling, project controls, and forensic analysis, with a keen eye for identifying schedule risks and discrepancies.

Key Responsibilities:

  • Develop and refine baseline Critical Path Method (CPM) schedules, ensuring alignment with phasing plans.
  • Work directly with project teams to facilitate pull planning sessions, optimizing sequencing and execution strategies.
  • Perform regular schedule updates, integrating actual progress and analyzing changes to the longest and near-longest paths.
  • Evaluate forecast schedules, adjusting logic as necessary to maintain project efficiency and continuity.
  • Conduct QA/QC reviews to detect and correct out-of-sequence logic, ensuring scheduling accuracy.
  • Perform time impact analyses, tracking schedule deviations and assessing project delays.
  • Analyze findings and provide clients with forecast reports, risk assessments, and strategic solutions.
  • Examine and interpret project cost control documents, ensuring financial alignment with scheduling projections.
  • Conduct in-depth research and fact-finding to support claims investigations and dispute resolution.
  • Apply methodologies outlined in AACE for forensic delay analysis, ensuring industry compliance.

Qualifications & Skills:

  • 3–8 years of experience in construction scheduling, forensic analysis, and claims resolution .
  • Bachelor's degree in Civil Engineering or Construction Management preferred.
  • Strong analytical thinking, problem-solving skills, and written communication abilities.
  • Ability to work under pressure, meet tight deadlines , and manage multiple projects simultaneously.
  • Expertise in CPM scheduling , covering both proactive planning and forensic claims analysis .
  • Experience in various sectors, including multi-family, commercial, hospitality, and healthcare projects .
  • Proficiency in MS Project, Primavera P6, and Oracle Cloud scheduling tools.
  • Preferred certifications include PSP (Planning & Scheduling Professional) or equivalent .
  • Candidates based in Austin, Houston, San Antonio or Dallas are preferred, with flexibility for client site travel .

Benefits:

  • Competitive base salary with bonus.
  • Very flexible hybrid work structure.
  • Young, dynamic, no pressure environment.
  • Comprehensive healthcare coverage, including medical, dental, and vision.
  • 401(k) plan with company contributions.
  • Paid vacation and personal leave.
  • Huge focus on professional development and leadership training opportunities.
  • Access to industry-leading technology and resources for forensic scheduling and dispute resolution.

This is an opportunity to work on high-impact projects , apply advanced scheduling techniques , and play a key role in dispute resolution and claims analysis .

If you have a strong background in construction claims/scheduling, apply now or contact me to have a confidential chat!

+1 254-254-1625

m.shahbaz@x4engineering.com

Job Tags

Permanent employment, Contract work, Flexible hours,

Similar Jobs

Nosh.com

Shift Brewer - Bottle Logic Brewing Job at Nosh.com

 ...us nearly unlimited flexibility in exploring the boundaries of beer. We offer free beer, competitive pay, a full health/vacation/401...  ...method. Kegging, canning, bottling bottling beers. Other brewery-related tasks that may require assistance. Any other duties delegated... 

D.E. Peabody, LLC

Class A Local and Regional Intermodal, Grocery and Dedicated Driver Contractor and Owner Operators needed in Colorado- D.E. Peabody, LLC Job Job at D.E. Peabody, LLC

Class A Local and Regional Intermodal, Grocery and Dedicated Driver Contractor and Owner Operators needed in Colorado- D.E. Peabody, LLC JobLocal and Mountain CDL-A Drivers, Independent Owner Operators and Fleet Contractor Professionals!D.E. Peabody, LLCDenver, CO... 

Jetty Healthcare

Healthcare Recruiter (Commission-Only, Remote) Job at Jetty Healthcare

 ...Company Description Jetty Healthcare specializes in providing healthcare staffing solutions, quickly matching health systems with qualified...  ..., commission-only, role at Jetty Healthcare. The Healthcare Recruiter will be responsible for tasks such as healthcare staffing,... 

Affirmations

Client Support Specialist-Remote Job at Affirmations

&##128188; Client Support Specialist Remote | No Experience Needed | Training Provided &##128205; Work From Home | &##128588; Background Friendly | &##127891...  ...protection, college savings, and more. This is an entry-level, remote opportunity. If youre passionate about... 

AMN Healthcare Allied

Travel CT Technologist - $2,284 per week Job at AMN Healthcare Allied

 ...: 6/9/2025 Available Shifts: 12 D Pay Rate: $2179.35 - $2388.01 CT Tech needed in Erie, PA.REQUIREMENTS: ARRT CT. BLS. PA fingerprints Required Qualifications CT Technologist, Computed Tomography Certifications: CTTECH-American Registry of Radiologic Technologists...